التخطي إلى المحتوى الرئيسي
Alushibe News logo, official platform of Alushibe Holding Group

Electrical Infrastructure Work Continues at Zulfa Production Facility

Pillar Installtion at Tusyali sulb project

Work is continuing on the electrical infrastructure at the Zulfa production facility in Benghazi, a food processing and packaging project being developed by Zulfa, a subsidiary of Alushibe Holding Group, in partnership with Tetra Pak Egypt Area. Recent activity has focused on preparing the site's power systems as construction moves toward the next stage of installation.


As part of that work, project management, consultants and engineering teams met to review the status of the facility's electrical infrastructure and discuss the technical steps needed for the next phase. At the same time, generators were positioned inside the main electrical substation, where installation work will take place.


Preparation has also continued at the external power station, with teams positioning generators ahead of the electrical connection phase. Together, these activities are helping prepare the site's power infrastructure before the equipment is installed and commissioned.

Electrical work remains a key part of the project's development, with teams continuing to prepare the systems that will support future operations at the facility.

More Insights

Installation Advances at Tosyali SULB Plant

Insights|2026-09-04

Equipment and Steel Installation Progress at Tosyali SULB

Work at the Tosyali-SULB complex in Benghazi advances above ground with steel framework erection, concrete casting, and mechanical equipment installation.

Read more →

Construction workers installing a large electrical transformer at the Tosyali SULB steel complex construction site in Benghazi, Libya.

Insights|2026-07-23

New Logistics Facility Takes Shape at Benghazi Steel Project

Progress updates on the Tosyali SULB Benghazi project: foundation piling near complete, steel assembly under way, and 220 kV substations taking shape.

Read more →